Welcome Guest [Log In] [Register]
Welcome to Miniature Railway World Forums, we hope you enjoy your visit.

You're currently viewing MRW Forums as a guest. This means you are limited to certain areas of the board and there are some features you can't use. If you join our community, you'll be able to access member-only sections, and use many member-only features such as customizing your profile, sending personal messages, and voting in polls. Registration is simple, fast, and completely free.


Join MRW Forums now!


If you're already a member please log in to your account to access all of our features.

Username:   Password:
Add Reply
Llechwedd Miniature Railway; Opening
Topic Started: 7 Aug 2009, 03:02 PM (737 Views)
martinneeves
Porter
[ * ]
Hi,
all just to let you know that the miniature railway in llechwedd will be up and running from Monday
Martin
Jordan
Offline Profile Quote Post Goto Top
 
P Scott
Cleaner
[ *  *  *  * ]
Interesting!

Gauge? Length? Layout? Is it a permanent track, or just laid for the summer season?

Thanks.

Peter S.
Offline Profile Quote Post Goto Top
 
rough-shunter
Director
[ *  *  *  *  *  *  *  *  *  *  *  * ]
Hi,
Sorry forgot to add the details,
It is 71/4 gauge only approximately 200 yards at present but we are extending it as and when we can initially running with a battery electric transfer switcher supplied by cromar white, it is temporary for this season to see how it fits in but looking forward to a permanent line
martin
JORDAN ASHLEY LEEDS

Trains go into tunnels and come out but locos can go in sheds and never come out
Offline Profile Quote Post Goto Top
 
SillyBilly
Member Avatar
Ticket Collector
[ *  * ]
Here are some photos taken when the on the Railway mid-July when it was run for the first time, I had the pleasure of driving for a day, very good views!
Posted Image
Posted Image
Posted Image
Posted Image

Best of luck with it guys.
Cheers,
William a.k.a Silly Billy
Joys of Life Railway Revival Project
Offline Profile Quote Post Goto Top
 
rough-shunter
Director
[ *  *  *  *  *  *  *  *  *  *  *  * ]
After maintanince and a few hours fettleing the llechwedd miniature railway carried its first fare paying passengers on tuesday afternoon and is growing from strength to strength
JORDAN ASHLEY LEEDS

Trains go into tunnels and come out but locos can go in sheds and never come out
Offline Profile Quote Post Goto Top
 
colinpeake
Member Avatar
MRW Digest Editor
[ *  *  *  *  *  *  *  *  *  *  *  * ]
A few photos taken in the pouring rain on Wednesday 18th August:

Posted Image

Posted Image

Posted Image

Posted Image

Colin
Colin Peake
MRW Digest Editor

Miniature Railways - Colin Peake's Photos
Offline Profile Quote Post Goto Top
 
Callum Darraugh
Member Avatar
Mug shot master
[ *  *  *  *  *  *  *  *  *  *  *  * ]
What is the layout of the railway Colin?

Nice pictures as well :)

Callum
Your train is cancelled due to the lack of the tea can on the footplate.

Posted Image

www.hilcotevalleyrailway.webs.com and www.trenthamfernrailway.webs.com Staffordshires Greatest Little Railways!
Offline Profile Quote Post Goto Top
 
colinpeake
Member Avatar
MRW Digest Editor
[ *  *  *  *  *  *  *  *  *  *  *  * ]
It's about 100 yards of straight track from the 'station' in pic 1 to the pointwork in pic 4, where there are a few more yards of track off to the left. Martin explained that more trackwork was due shortly and that the next phase should include some covered accomodation.

Colin
Colin Peake
MRW Digest Editor

Miniature Railways - Colin Peake's Photos
Offline Profile Quote Post Goto Top
 
rough-shunter
Director
[ *  *  *  *  *  *  *  *  *  *  *  * ]
miniature railway world forum members Ride free from Monday
JORDAN ASHLEY LEEDS

Trains go into tunnels and come out but locos can go in sheds and never come out
Offline Profile Quote Post Goto Top
 
P Scott
Cleaner
[ *  *  *  * ]
Will you still be running over the weekend of 12/13 September, or perhaps even on Friday 11th September?

If so, what times?

Peter S.
Offline Profile Quote Post Goto Top
 
martinneeves
Porter
[ * ]
P Scott
28 Aug 2009, 04:19 PM
Will you still be running over the weekend of 12/13 September, or perhaps even on Friday 11th September?

If so, what times?

Peter S.
Hi peter and all,
Yes we will be running on the dates mentioned normally between 11 and 4, there may be a possibility that on the Friday if there are not many about that we will not be running, please call Jordan on 07773185342 daytime or evening or 01678 520367 between 6 and 7 most evenings.
Regards
Martin
Jordan
Offline Profile Quote Post Goto Top
 
P Scott
Cleaner
[ *  *  *  * ]
Thanks.

Good to you both on Saturday - I understand tow of my friends also visited shortly after!

Peter S.
Offline Profile Quote Post Goto Top
 
rough-shunter
Director
[ *  *  *  *  *  *  *  *  *  *  *  * ]
indeed peter they did within 2 hours of you being on site
JORDAN ASHLEY LEEDS

Trains go into tunnels and come out but locos can go in sheds and never come out
Offline Profile Quote Post Goto Top
 
rough-shunter
Director
[ *  *  *  *  *  *  *  *  *  *  *  * ]
llechwedd miniature railway on youtube
it may not be long but its small and delightful.

Thankyou to all our visitors it has been a plesure to meet you all , the railway is now running on weekends 11am -3pm saturdays and 1pm -4pm sundays
regards jordan
JORDAN ASHLEY LEEDS

Trains go into tunnels and come out but locos can go in sheds and never come out
Offline Profile Quote Post Goto Top
 
martinneeves
Porter
[ * ]
Dear all,
An up date with regarding Llechwedd miniature railway

An agreement has been reached for the extension and the permanent installation of the railway.
The main route will remain the same, but with an extension at the fair end passing around the back of an the old house, part of which will become an loco/carriage shed and small work shop, then to terminate at a station in front of the Victorian shops, the main station will be moved to a location opposite the main entrance and buildings adding a further extension of the main line from its present location.
This follows a considerable investment by the mine.
It is proposed by the directors of the mine that the line be up and running for Easter 2010
At the present the railway will be open for half term and other special events.
But not presently weekends due to staff shortages.

Offline Profile Quote Post Goto Top
 
« Previous Topic · 7¼" - 10" · Next Topic »
Add Reply