Route 75 Trackless; Reverse loop at Wayne Junction
Topic Started: Oct 31 2008, 02:10 PM (4,944 Views)
TransitChuckG
Foamer
[ *  *  *  *  *  *  *  *  *  *  *  * ]
I was talking to rider of the 75 and he says the new Wayne Junction loop routing seems more "natural", like it always should have been that way.
The problem still would have been the reversal of GREENE st., seems like it always ran southeast.
Offline Profile Quote Post Goto Top
 
TransitChuckG
Foamer
[ *  *  *  *  *  *  *  *  *  *  *  * ]
Quote:
 
75WB ARROTT AND LARGE Weekdays 09:00 to 16;00
W/B det via Arrott
R- Large
L- Harrison
L- Castor
Reg route8/17/2009
10:14 AM8/28/2009
6:00 PMPWD


I was told this detour is not effective every day, it's off and on.

If they are not going to work on the Arrott steps, then put the trackless wires back up!
Offline Profile Quote Post Goto Top
 
TransitChuckG
Foamer
[ *  *  *  *  *  *  *  *  *  *  *  * ]
The switch is messed up at Penn & Arrott. The poles are not tracking correctly across the intersection for the 75, or around the corner for the 59. The wire truck is on the way.
Offline Profile Quote Post Goto Top
 
TransitChuckG
Foamer
[ *  *  *  *  *  *  *  *  *  *  *  * ]
Quote:
 
The switch is messed up at Penn & Arrott. The poles are not tracking correctly across the intersection for the 75, or around the corner for the 59. The wire truck is on the way.

The wire crew took a hammer to it yesterday and fixed it. It was balky from not being used, the 59's are EPU from Arrott Terminal to Harrison, so the switch wasn't being thrown. When a 59 tried the switch on electric, it was stuck, now it's working.
The escalator was down for a few days at Arrott, now it's working.